question on an example of all-in-one

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

Nirvana

Member
Joined
Jul 29, 2018
Messages
16
Reaction score
2
example 116.4 seismic load.

Why using n=43.5/h^(1/9) to obtain the first period (1/n), not using T=Ch^x? The results from the two equations are quite a bit, one is 0.85 and the other is 0.5x.

The former equation is mentioned in wind load, which has some more limitations, such as the height of building and wind direction.

Ex. 116.4 part 1.PNG

Ex. 116.4 part 2.PNG

 
Last edited by a moderator:
IT would help if you can post the question, I don't have the all in one with me. are you referring to the natural frequency? or natural period? 

 
IT would help if you can post the question, I don't have the all in one with me. are you referring to the natural frequency? or natural period? 
first time pasted attachement, hope it works.

 
Back
Top