I decided to make up a morning lateral problem for an ECBF:
A W18x50 link beam has been deemed adequate for an eccentrically braced frame. What link length is required to keep the beam link controlled by shear yielding.
A W18x50 link beam has been deemed adequate for an eccentrically braced frame. What link length is required to keep the beam link controlled by shear yielding.