Quiz #6 (3 minute question)

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

ptatohed

Licenced to Spell
Joined
Oct 27, 2010
Messages
3,745
Reaction score
735
Location
Murrieta, CA
1.)

If the control delay for a four-way intersection with stop signs at each approach is 27.8 s/veh, what is the level of service for the intersection?

A.) B
B.) C
C.) D
D.) E

2.)
How long did problem #1 take you?

A.) 1 minute, 2 max
B.) right on the money at 3 minutes
C.) 4 minutes or more
D.) I am still working on it!

 
I get answer C, LOS D

Exhibit 20-2

I knew this was a HCM look up and found chapter 20 within 2 minutes.

I wish I could get on here more often.

 
LOS D

Table 20-2 HCM

Control Delay>25-35

I'm not very familiar with the HCM yet, so this took me a few minutes. I knew it was a quick lookup, but wasn't positive where to find it.

 
But this is not a representative question(s) since NCEES does not ask questions where you can only answer one question AFTER you have answered another. Stop misdirecting the people, ptatohed

 
But this is not a representative question(s) since NCEES does not ask questions where you can only answer one question AFTER you have answered another. Stop misdirecting the people, ptatohed




3.)

If your answer to problem #2 was C or D, what might you do to get answer A or B next time, so that you can be faster at problem #1?

A.) Switch From Transpo to one of the other PM Depths

B.) Consider buying an HCM

C.) Drink more Mountain Dew

D.) But my answer was A or B for #2, so how do I answer this #3?

 
Last edited by a moderator:
Back
Top