ERRATA - RUWAN Construction Module Practice Problems

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

Jayman_PE

Quid pro quo
Joined
Jun 12, 2011
Messages
269
Reaction score
4
Location
Minnesota
Overall a very good text. Some rough patches, but lots of good depth for us Construction people.

Here is what I found so far

  • Page 33. PP 15. I'm not sure if the Author's solution is correct - Mmax should be a function of the axle location relative to the midpoint of the beam. It might be oversimplified here.
  • Page 47. Problem 31. Solution should be $660,000 for 3 years, not 4.
  • Page 188. Ex. 4, Formwork Labor Hours (LH) should be 12 x 75/100 = 9 LH's, thus total cost should be $771 (not $936).
  • Page 188. Ex. 5. Should specify Hrs/day for Grading production. Assuming 8 hour days is probably not realistic.



Feel free to add more as necessary.