I have to design a pile group that does not have sufficient overburden to obtain fixity. So it looks as if I'll have to rock socket three (3) feet into bedrock. I was going to use steel H-piles, however if a drilled shaft is required in order to rock socket I'm wondering if I should just drop a rebar cage and concrete in the casing or drop the H-pile in the casing and concrete it.

I'm not really considering cost at this point.

In either case I would prefer to keep a round section to cut down on turbulence in the event of a scour condition.

Any thoughts?

Share this post


Link to post
Share on other sites

how deep are you able to go? You might have to just use a shallow foundation?

Share this post


Link to post
Share on other sites

I would do that normally but laying back to reach bedrock is a problem. Maybe a braced cut could work but it has to shake out that way between a bunch of other PEs (you know how it is).

Share this post


Link to post
Share on other sites

We're going to concrete the H-piles in the rock sockets and then backfill the rest of the casing with sand.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now
Sign in to follow this  
Followers 0